Siteworks Terms

Terms used in the Site Works Request are explained below

Site Works Request Terms

MPRN
Meter Point Reference Number
Meter Point Administration Number

Serial Number
Meter Serial Number
This is the serial number of the meter.

AAQ
Estimated Annual Gas Consumption
This is the maximum annual gas load you will be expecting to use through your meter in a single year, based on the maximum capacity of the gas appliances you are planning to have at site.

SHQ
Estimated Hourly Gas Consumption
This is the maximum hourly gas load you will be expecting to use through your meter in a single hour, based on the maximum capacity of the gas appliances you are planning to have at site.

Est Daily Load
Estimated Daily Load
This is the average daily gas load you will be expecting to use through your meter each day.

AAQ Existing
Existing Annual Gas Consumption

AAQ Additional
Additional Annual Gas Consumption
How much extra gas will you be consuming annually? (not including your existing)

AAQ New Total Load
Annual Gas Consumption New Total Load
This will be your existing annual gas consumption plus your additional annual gas consumption.

SHQ Existing
Existing Hourly Gas Consumption

SHQ Additional
Additional Hourly Gas Consumption
How much extra gas will you be consuming hourly? (not including your existing)

SHQ New Total Load
Hourly Gas Consumption New Total Load
This will be your existing hourly gas consumption plus your additional hourly gas consumption.

Inlet Pressure Greater than 21mbar
Is Inlet Pressure Greater than 21mbar
To determine this for a new meter install, you will need to contact your service installer who will be able to tell you this. For existing services, there should be a yellow tag attached either to the end of the service, or on the meter, which will tell you what the pressure tier is.

Service Pressure
Gas Mains Pressure
To determine this for a new meter install, you will need to contact your service installer who will be able to tell you this. For existing services, there should be a yellow tag attached either to the end of the service, or on the meter, which will tell you what the pressure tier is.

Preferred Comp Date

Preferred Completion Date
The date you would like the work completed.

Site Plan
Site Plan
A drawing showing the site and required works.

Job Types Terms
Service Install only
Inlet pipework before the meter
Site Plans Requirements: Proposed service route and scaled site plan of build showing surrounding geography

Meter Install only
New gas meter
Site Plans Requirements: Indication of proposed meter location

Pipework Disconnection
Disconnection of gas supply
Site Plans Requirements: Optional

Meter Disconnection
Removal of gas meter
Site Plans Requirements: Optional

Pipework Purging
Disconnection of gas supply and purging of gas
Site Plans Requirements: Optional

Capacity Change Service
Increase in consumption of service. Will check if service is capable of supplying new load
Site Plans Requirements: Scaled site plan showing surrounding geography, and indicating current service and meter location(s)

Capacity Change Meter
Increase in consumption through meter. Will check if meter is capable of supplying new load
Site Plans Requirements: Indication of existing meter location.

Relocation Service
Divert service to new location
Site Plans Requirements: Scaled site plan showing surrounding geography, and indicating current and new service and meter location(s)

Relocation Meter
Change in meter location
Site Plans Requirements: Current location and proposed new location.

Meter & Kiosk Install
New gas meter and housing
Site Plans Requirements: Indication of proposed meter location

H&S Disconnection/Isolation
Health & Safety Disconnection/Isolation
Site Plans Requirements: Optional

Chatterbox
Relay Isolation Unit (Chatterbox) is a battery powered isolation unit which accepts pulses from meters, correctors or similar equipment to produce isolated output
Site Plans Requirements: Indication of existing meter location and proposed location of chatterbox.

Outlet Pipe work
Pipe work after the meter (e.g. to a boiler)
Site Plans Requirements: Plan showing current / new service and meter locations

Meter Exchange
Meter Replacement
Site Plans Requirements: Indication of existing meter location

Kiosk
Is a housing (Kiosk) required for the meter?
Site Plans Requirements: Optional

Base Install
Is a concrete base required for the meter housing?
Site Plans Requirements: Plan indicating base location

Excavation & Reinstatement on Private
Do you require Corona to quote for digging trenches for new service works on private land.
Site Plans Requirements: Plan showing proposed service route

OFMAT Test
Gas meter test
Site Plans Requirements: Indication of existing meter location

Boosters
A booster is required on installations where the required gas burner supply pressure falls below the minimum required for the appliance to achieve full ouput
Site Plans Requirements: Optional

Telnergy Limited

Office
Hello House
135 Somerford Road
Christchurch
Dorset
BH23 3PY

Bill Upload Form

Your Name (required)

Your Email (required)

Subject

Your Message

Attach Your Energy / Phone Bill